From a tower wrapped in green netting after topping-out, Wink Hanoi Westlake now has the look of a WINK-branded hotel. Its transformation has been captured from the same familiar viewpoint: the guard booth, the round street lamp and the blue hoarding stay where they are, while the tower behind them keeps changing.
Under the Saigon sun, a short drive from Tan Son Nhat International Airport, the KITA Group Office Building site is completing the reinforcement for its level 4 beams and slab. Along the rounded front façade, the building’s signature curve is already taking shape – in steel.
From above, the Vega City Nha Trang construction site is gradually revealing its evolving form. Across the site, multiple construction activities are progressing simultaneously, from reinforced concrete structures, beams and slabs to masonry, finishing works and MEP installation — steadily transforming design drawings into built reality.
On 16 September 2026, Viteccons took part in the groundbreaking ceremony of the Multilevel Hai Phong School Project of SH Vietnam, held at the VSIP Hai Phong Township, Industrial and Service Park in Thuy Nguyen Ward, Hai Phong City. As the General Contractor, Viteccons is responsible for the full scope of works — from structure, finishes and MEP to infrastructure and landscape.
In Ha Long City, Sora Bay is taking on a new appearance as the scaffolding is progressively dismantled. As Main Contractor for 130 shophouse units, Viteccons is carrying out finishing works across the project, inside and out.
Following its successful contribution to the Learning Block, Viteccons has once again been selected by Van Hien University to undertake the basement construction package for the Complex VHU30 Project, marking the second project between the two parties within the same university campus.