Project Overview:
Land area: 18.69 hectares
Location: Nhơn Trạch 2 Industrial Park - Nhơn Phú, Nhơn Trạch, Đồng Nai, adjacent to Ho Chi Minh City
Products: Ready-built factories, built-to-order factories
Key Features:
Strategic location: Surrounded by major transportation infrastructure including 3 ports, 2 highways, and the future Long Thanh International Airport in the Southern Key Economic Zone
Singapore-standard infrastructure: Investors can operate within a well-developed and managed infrastructure based on Singapore standards
Reliable one-stop service: Investors benefit from reliable one-stop services from the developer, from initial consultation to periodic support throughout the investment process
Viteccons' Role:
Main Design and Construction Contractor: Responsible for 5 workshops with a total construction area of nearly 5.8 hectares
Project completion: Expected within 12 months